SYSTEM DESIGN SERVICE
(Steam and Water Sampling System for Nuclear Power plant)
- UAE BNPP UNIT 1~4 (Hyundai Heavy Industry/ Urim Technology): 2014.04 ~ Present
- Shin Hanul UNIT 1&2 (Hyundai Heavy Industry/ Urim Technology): 2014.06 ~ Present
SYSTEM COMPONENT
- MAGNETIC FILTER: ShinHanul Nuclear Power plant 1&2
- SAMPLE COOLER: Testing
- CONTINUOUS AUTO SAMPLER: Under developing
- UNIFIED SAMPLING SYSTEM MODULE: Under developing